This email address is being protected from spambots. You need JavaScript enabled to view it.

063 219 6634

About Us

We were responsible for the demolition of the smokestacks 63 meters in Brakpan Brick plant, the demolition of the concrete piers, and other smaller concrete works. We have also done road cuttings and trench excavations Bruma outfall sewer. Excavation and blasting. Blasting of foundations for Melrose arch Shopping complex Johannesburg. Removing rock for construction of swimming pools and smaller structures. Excavation for AECI gas pipeline from Klip Spruit to Robinson deep landfill 14.5 km trench blasting. Pre-drill and blast trenching for main water main. (Grosso Construction) in Soweto Gauteng.

We have never been delayed or stopped on any contract through injury or accident, only by inclement weather. Splitrock has never had any claim for injury through Workmen’s Compensation. A health and safety plan is in place. All our work is done in strict accordance with the regulations laid down by AEL, who supply the explosives, and we work under the control of the Inspector of Explosives (South African Police Services).
We carry our own public liability insurance.

Our Services

  • Close proximity blasting
  • Chemical and conventional
  • Mass and bulk blasting; using explosives
  • Specialized blasting and removing of rock

Contact Details

This email address is being protected from spambots. You need JavaScript enabled to view it.

063 219 6634

Copyright © 2026. All Rights Reserved. Designed by Web Partner